1. Initial On-Site Meeting
We visit the site to be transformed
Assess access, soil type, slope, and sun exposure
Discuss the client’s vision and share ideas
2. Study & Budgeting
Cost breakdown: materials, equipment, labor, and machinery
Preparation of a detailed, personalized proposal
3. Alignment & Planning Meeting
After approval, we hold another meeting with the client
Explain all phases of the process
Mark the area for the natural pool and fence it if necessary
4. Site Preparation & Excavation
Clean and mark the working area
Excavate and create tiered levels with different depths
Grade and fine-tune the levels with manual work
5. Essential Infrastructure
Initial masonry for the filtration system base (sump)
Complete waterproofing of the natural pool area
Installation of piping network and water circulation system
6. Finishing & Aquatic Landscaping
Add sand, river pebbles, and natural stone to the lakebed
Begin filling, adjusting inlets and outlets
Install underwater lighting
Landscape with aquatic and marginal plants
7. Filtration System & Machine Room
Build the machine room and install the electrical system
Finish the sump with filter media and pumps
Perform the first system cleaning
8. Finalization & Maintenance
Install final treatment equipment
Activate the lake with filtering bacteria
Second cleaning with training for the client/maintenance person